Saturday, May 29, 2010

Installation of Taco pumps and commissioning

In any case, whatever the Taco pump was not selected, the installation must adjust its operating point in all possible modes. When commissioning should be supplied to measure flow rate (determined by the speed of filling any container of known volume, such as barrels), produced by pressure (as indicated by pressure gauge on the top), and consumed with the current (measured current outputs with forceps).

These characteristics are reconciled with passport data Taco 006 pump in the catalog. By exceeding the operating parameters (typically some reserve capacity for example, provides for installation of filters) should cover the heating Taco Mixing valve at the outlet from the well, to create additional local resistance, sufficient to establish the correct operating point - mid-performance Q (H).

Installation, as the choice of the circulator pumps, should exercise trained professionals erection company must have a license to install the equipment.

  • Taco 006 B4 - Taco 006 B4 Bronze Circulator Pump, 1/8 HP, 115V
  • Taco 006 bronze - Taco 006 Bronze Circulator Pump, 1/8 HP, 115V
  • Taco 006 ST4 - Taco 006 ST4 Stainless Steel Circulator Pump, 1/8 HP, 115V
  • Taco 006 Stainless Steel - Taco 006 Stainless Steel Circulator Pump, 1/8 HP, 115V
 